A
LICENSE, PERMISSION, APPROVAL, ON-SITE INSPECTION AND AUDIT SERVICES FOR RADIATION FACILITIES AND RADIATION PRACTICES

A-1

LICENSES

A-1.01

Licensing of medical radiology, dental radiology and veterinary radiology devices; stationary devices used for process control and measurement; irradiation devices; analysis, measurement, detection devices and X-ray analyzers containing low-activity radioactive sources; vehicle/container scanning devices, package/baggage control devices, smuggled goods/explosive detection detectors; low-activity radioactive sources; practices with electron beam welding machines; industrial cabinet radioscopy practices; radioimmune test practices; manufacturing, maintenance and repair of radiation sources or radioactive source reloading practices; import, export and transportation activities of radiation sources

12.474,00

TL/Device or Activity

A-1.02

Licensing of practices with radiotherapy, industrial radiography, industrial radiography in the shielded area, well logging systems, mobile/portable nuclear measuring devices

15.212,00

TL/Device

A-1.03

Licensing of nuclear medicine practices

63.447,00

TL/Unit

A-1.04

Licensing of facilities specially designed for irradiation, accelerator, proton therapy, radioactive source preparation, manufacturing, maintenance and repair of radiation sources

99.695,00

TL/Facility

A-1.05

Renewal of license or change of scope

Half of (50 percent of) the related license fee

TL

A-2

PERMISSIONS

A-2.01

Commissioning permission for irradiation (gamma irradiation), accelerator, radioactive source preparation (radiopharmaceutical preparation, radioisotope generator production/preparation), proton therapy facilities

27.916,00

TL/Facility

A-2.02

Decommissioning permission for irradiation, accelerator, radioactive source preparation, proton therapy facilities

31.931,00

TL/Facility

A-2.03

Import, export, temporary entry-exit (import-export), transport, transit permit or letter of conformity for radioactive sources or the device/equipment/hardware that can be used with radioactive sources

3.467,00

TL

A-3

APPROVALS

A-3.01

Site approval for irradiation facilities (facilities where the radioactive source is stored in the pool)

44.358,00

TL/Facility

A-3.02

Spatial design approval for radiotherapy, industrial radiography performed in shielded area, manufacturing, maintenance and repair of radiation sources or radioactive source reloading practices and other optional radiation practices

7.395,00

TL/Room

A-3.03

Spatial design approval for nuclear medicine practices

44.358,00

TL/Unit

A-3.04

Spatial design approval for facilities specifically designed for irradiation, accelerator, proton therapy, radioactive source preparation, manufacturing, maintenance and repair of radiation sources

71.372,00

TL/Facility

A-3.05

Revised spatial design approval for nuclear medicine practices and facilities specifically designed for irradiation, accelerator, proton therapy, radioactive source preparation, manufacturing, maintenance and repair of radiation sources

İlgili mekansal tasarım onayı bedelinin %50'si

TL

A-4

ON-SITE EXAMINATION AND INSPECTIONS

A-4.01

Repetition of on-site examination for authorization of radiation facilities and radiation practices (for each new on-site examination)

6.934,00

TL

A-4.02

On-site examination, evaluation and inspection service in terms of radiation safety upon request

15.219,00

TL

B
SERVICES RELATED TO RADIATION PROTECTION

B-1

CERTIFICATE OF CONFORMITY FOR RADIATION MEASUREMENT SYSTEMS (FOR INTERNATIONAL SURVEILLANCE COMPANIES, METAL SCRAP PROCESSING/HANDLING FACILITIES)

B-1.01

Certificate of conformity

15.920,00

TL

B-2

CERTIFICATE OF AUTHORIZATION (FOR ORGANIZATIONS TO PROVIDE DOSIMETRY SERVICE)

B-2.01

Certificate of authorization

58.339,00

TL

B-2.02

Annual database usage of up to three thousand people

232.548,00

TL

B-2.03

Annual database usage of over three thousand people

348.771,00

TL

B-3

AUTHORIZATION OF ENVIRONMENTAL REMEDIATION ACTIVITIES OF CONTAMINATED AREAS

B-3.01

Authorization of environmental remediation activity

315.304,00

TL

B-3.02

Inspection services*

5.473,00

TL/Man Day

B-3.03

Release of the area from regulatory control

262.752,00

TL

*

From the authorization of the environmental remediation activity to the release of the area from regulatory control, the inspection fee is paid by the authorized person.
This fee is determined by the Authority according to the work plan to be submitted by the authorized person to the Authority and includes the inspection for the number of days (person days) notified to the authorized person in December each year. Payment is made in advance in January of each year. In the year the authorization is granted, the insection fee notified together with the authorization is paid within 30 days. In case of changes in the work plan, the audit fee is determined again.

C
LICENSE, PERMIT, APPROVAL AND INSPECTION SERVICES RELATED TO NUCLEAR FACILITIES AND NUCLEAR MATERIALS

C-1

PERMITS, LICENSES AND INSPECTIONS OF NUCLEAR FACILITIES

C-1.01

Permit and Licenses for Nuclear Power Plants * (for each permit or license)

C-1.01.01

Reconginition of Owner

972.961,00

TL

C-1.01.02

Site License

37.183.205,00

TL

C-1.01.03

Construction License

498.681.962,00

TL

C-1.01.04

Commissioning Permit

165.711.169,00

TL

C-1.01.05

Fuel Loading and Trial Operations Permit

48.319.500,00

TL

C-1.01.06

Full Power Operating Permit and Operating License

41.427.668,00

TL

C-1.01.07

Permit for Bringing Fuel (and Heavy Water) to the Site

9.591.193,00

TL

C-1.01.08

Heavy Water Loading Permit

8.965.855,00

TL

C-1.01.09

Permit for Re-starting Operation

20.675.116,00

TL

C-1.01.10

Permit for Modifications **

5.985,00

TL/Man Hour

C-1.01.11

Permit for Start of Procurement

712.425,00

TL

C-1.01.12

Limited Work Permit

53.120.334,00

TL

C-1.02

Permit and Licenses for Research Reactors*

C-1.02.01

Reconginition of Owner

47.969,00

TL

C-1.02.02

Site License

264.108,00

TL

C-1.02.03

Construction License

1.598.474,00

TL

C-1.02.04

Commissioning Permit

215.408,00

TL

C-1.02.05

Fuel Loading and Trial Operations Permit

215.408,00

TL

C-1.02.06

Full Power Operating Permit and Operating License

423.959,00

TL

C-1.02.07

Permit for Bringing Fuel (and Heavy Water) to the Site

104.260,00

TL

C-1.02.08

Heavy Water Loading Permit

104.260,00

TL

C-1.02.09

Permit for Re-starting Operation

159.847,00

TL

C-1.02.10

Permit for Modifications **

2.112,00

TL/Man Hour

C-1.02.11

Permit for Start of Procurement

83.415,00

TL

C-1.02.12

Limited Work Permit

535.181,00

TL

C-1.03

Permit and Licenses for Mining, Milling, Refining and Storage Facilities *

C-1.03.01

Reconginition of Owner

47.969,00

TL

C-1.03.02

Site License

264.108,00

TL

C-1.03.03

Construction License

1.598.474,00

TL

C-1.03.04

Trial Operations Permit

63.354,00

TL

C-1.03.05

Full Capacity Operating Permit and Operating License

423.959,00

TL

C-1.03.06

Permit for Re-starting Operation

159.847,00

TL

C-1.03.07

Permit for Modifications **

2.112,00

TL/Man Hour

C-1.03.08

Permit for Start of Procurement

83.415,00

TL

C-1.03.09

Limited Work Permit

158.390,00

TL

C-1.04

Declaration of intent, approval, permission, license and inspection of radioactive waste management facilities***

  

C-1.04.01

Declaration of intent

95.531,00

TL

C-1.04.02

Approval of site

3.075.634,00

TL

C-1.04.03

Permission of constraction

12.548.589,00

TL

C-1.04.04

Permission of commissioning

1.568.574,00

TL

C-1.04.05

Licence of operation

3.137.147,00

TL

C-1.04.06

Permission of modification**

3.616,00

TL/Man Hour

C-1.04.07

Service of inspection on radioactive waste management facilities****

1.568.574,00

TL/Year

C-1.04.08

Permission of decommissioning and closure

12.548.589,00

TL

C-1.05

Nuclear Power Plant Inspections*****

  

C-1.05.01

Nuclear power plant inspection service (for each unit)

122.689.051,00

TL/Year

C-1.05.02

Mining, milling, refining and storage facility inspection service (for each facility)

202.425,00

TL/Year

*

"The following process is applied for the payment of service fees in all of the permit or license services given to nuclear facilities. Exceptions are defined in the relevant permits or licenses.
In nuclear facilities, 1% of the permit or license service fee is deposited into the Authority's account at the time of application. If this fee is not paid, the application will not be reviewed.
As a result of the review of the application, 79% of the service fee is deposited into the account of the Authority, within one month at the latest, following the notification that it has been accepted by the Authority and that detailed evaluation will begin. If the fee is not paid within the time limit, the review will be suspended until the payment is made.
In case it is notified that a permit or license will be granted as a result of the review by the Authority, 20% of the service fee is deposited into the Authority's account.
If this fee is not paid, no permit or license will be granted.
For applications that do not result in a positive result for any reason, the service fee collected until that day is not refunded, and the same service fees are charged for re-applications."

   

**

The service fee for the permit for modifications in nuclear facilities is calculated over the labor force spent and is collected as the document cost after the review is completed.

***

Excludes deep geological disposal facility. For radioactive waste management facilities that will only carry out processing and storage activities of radioactive waste, 50% of the other service fees are paid, excluding the declaration of intent and inspection fees.

  

****

"An annual inspection fee is paid from the construction of the radioactive waste management facility, including its operation, until it is released from regulatory control.
After the closure permit is obtained for the disposal facilities, 25% of the inspection cost is paid until it is released from regulatory control. Payment is made in advance in January of each year. For the year in which the permit is granted; the fee calculated by proportioning the remaining days of the relevant year, taking into account the day the permit is granted, is paid within 30 days."

*****

During the construction and operation of the nuclear facility, an annual inspection fee is paid from the facility or unit is granted a limited work permit until removal of regulatory control. Payment is made in advance in January of each year. For the year in which the permit is granted; the fee calculated by proportioning the remaining days of the relevant year, taking into account the day the permit is granted, the fee is paid within 30 days.

  

C-2

AUTHORIZATION OF NUCLEAR INSTALLATION OPERATING PERSONNEL

  

C-2.01

Authorization of operating personnel

  

C-2.01.01

Nuclear power plant operating personnel authorization certificates (senior operator, operators)

20.000,00

TL

C-2.01.02

Research reactor operating personnel authorization certificates (senior operator, operator)

3.500,00

TL

C-2.02

Renewal of the authorization certificate for operating personnel of nuclear installations

50% of the service fee of the relevant authorization certificate

TL

C-2.03

Modification on the nuclear installations operating personnel authorization certificate or reissue of the authorization certificate due to loss

20% of the service fee of the relevant authorization certificate

TL

C-3

IMPORT-EXPORT-TRANSPORT-TRANSIT PERMITS, APPROVALS AND INSPECTIONS OF NUCLEAR MATERIALS AND STRATEGIC MATERIALS

C-3.01

Import-export permits for nuclear materials

  

C-3.01.01

Import-export permit for fresh fuel, non-fuel enriched uranium or uranium hexafluoride

373.000,00

TL

C-3.01.02

Import-export permit for spent fuel

746.000,00

TL

C-3.01.03

Import-export permit for other nuclear materials or strategic materials other than nuclear materials*

3.467,00

TL

C-3.02

Transport permits for nuclear materials**

C-3.02.01

Transport permit for fresh fuel, non-fuel enriched uranium or uranium hexafluoride

373.000,00

TL

C-3.02.02

Transport permit for spent fuel

746.000,00

TL

Transit permits for nuclear materials

C-3.03.01

Transit permit for fresh fuel, non-fuel enriched uranium or uranium hexafluoride

50.000,00

$

C-3.03.02

Transit permit for spent fuel

100.000,00

$

C-3.03.03

Transit permit for other nuclear materials*

200

$

C-3.04

Compliance of package design approval for nuclear materilas

C-3.04.01

Compliance of package design approval for fresh fuel, non-fuel enriched uranium or uranium hexafluoride

5.000,00

$

C-3.04.02

Compliance of package design approval for spent fuel

50.000,00

$

C-3.04.03

Compliance of package design approval for other fissile materials***

5.000,00

$

C-3.05

On-site inspection and inspection service regarding import-export-transport-transit permits of nuclear materials

   

C-3.05.01

On-site examination and inspection within the borders of the Republic of Türkiye

50.000,00

TL/On-site examination and inspection

C-3.05.02

On-site examination and inspection outside the borders of the Republic of Türkiye

25.000,00

$/On-site examination and inspection

*

"Mineral ores containing radioisotopes such as uranium and thorium naturally found in nature;
Natural uranium or depleted uranium or natural thorium or their solid and liquid compounds/mixtures, other than uranium hexafluoride, in non-irradiated solid state;
Nuclear materials that are not used in radiation applications and that fall outside the definition of fissile material in accordance with the Regulation on Safe Transport of Radioactive Material."

**

For domestic transport related to import-export, no additional transport permit fee is charged, apart from the import-export permit fee.

***

Specified in the Regulation on Safe Transport of Radioactive Material; fissile material refers to uranium-233, uranium-235, plutonium-239, plutonium-241 or combinations thereof. Natural uranium or depleted uranium irradiated in thermal nuclear reactors and non-irradiated natural uranium and depleted uranium are excluded from this definition.

  

C-4

MANUFACTURER APPROVALS AND INSPECTIONS

C-4.01

Manufacturer approval

  

C-4.01.01

Manufacturer approval (manufacturing facilities within the borders of the Republic of Türkiye)

736.517,00

TL

C-4.01.02

Manufacturer approval (manufacturing facilities outside the borders of the Republic of Türkiye)

45.268,00

$

C-4.02

Renewal of manufacturer approval or expansion of manufacturer approval scope

50% of the service fee of the relevant manufacture approval

TL or $

C-4.03

Manufacturer follow-up, control and periodic inspection service

Lorem Ipsum   

C-4.03.01

Manufacturer follow-up, control and periodic inspection service (manufacturing facilities within the borders of the Republic of Turkey)

72.987,00

TL/Inspection

C-4.03.02

Manufacturer follow-up, control and periodic inspection service (manufacturing facilities outside the borders of the Republic of Turkey)

14.234,00

$/Inspection

C-5

CONSTRUCTION INSPECTION AUTHORIZATION CERTIFICATE AND INSPECTIONS

Lorem Ipsum    

C-5.01

Authorization certificate for inspection of structures, systems and components important for nuclear safety (domestic company)

736.517,00

TL

C-5.02

Authorization certificate for inspection of structures, systems and components important for nuclear safety (foreign company)

45.268,00

$

C-5.03

Authorization certificate for inspection of structures, systems and components not important for nuclear safety (domestic company)

132.332,00

TL

C-5.04

Authorization certificate for inspection of structures, systems and components not important for nuclear safety (foreign company)

14.234,00

$

C-5.05

Renewal of authorization certificate or expansion of the authorization certificate scope

50% of the service fee of the relevant authorization certificate

TL or $

C-5.06

Nuclear construction inspection organization follow-up, control and periodic inspection service

C-5.06.01

Nuclear construction inspection organization follow-up, control and periodical inspection service (the ones whose address in the authorization certificate is within the borders of the Republic of Turkey)

72.987,00

TL/Inspection

C-5.06.02

Nuclear construction inspection organization follow-up, control and periodical inspection service (whose address in the authorization certificate is outside the borders of the Republic of Turkey and performs inspection activities outside the borders of the Republic of Turkey)

14.234,00

$/Inspection

C-5.06.03

Nuclear construction inspection organization follow-up, control and periodic inspection service (the ones whose address in the authorization certificate is outside the borders of the Republic of Turkey but perform their inspection activities within the borders of the Republic of Turkey)

100.890,00

TL/Inspection

D
OTHER

  

D-1

REISSUING OF LICENSE CERTIFICATE

   

D-1.01

Making changes on license document or reissuing of the license certificate due to loss (excluding nuclear power plant licenses)

3.500,00

TL

  

The Transaction and Service Fees List is valid as of 1/1/2023.

In payments, transfer/EFT and bank charges are not included in the transaction and service fees.

Payments are made by the accrual number to be taken from the Institution. It is paid online to T.C Ziraat Bank Ankara Public Corporate Branch. (Alternatif çeviri: An accrual number is taken from the Institution for payments. With the accrual number, It is paid online to T.C. Ziraat Bank Ankara Public Corporate Branch.)

18% VAT is included in transaction and service fees.

-

File